The Silver Strand ended up being too grey, the sea salt had more green in it than I thought and didn't realize the green until we held it against the blues. The Rain wasn't a subtle enough but I liked the blues the best. Designer Becky ended up finding us the perfect color called Mountain Air. It was the neutral I wanted from the grey but the color from the blues.
All of the walls in the whole house will be the Mountain Air and the trim and ceilings will be Alabaster which is an off-white.
We had the option to choose one additional color for the walls but we aren't sure where exactly we would want a different color. My cousin told me they painted her laundry room a fun (red jalapeno) color so maybe we will use the extra color choice for that. Let me know if you have some fun suggestions!
This meeting we also chose the tile flooring for the bathrooms, tile for master bath, and fixtures. I didn't get a picture of the fixtures for the sink and bath tub but they are a brushed nickel. The hexagon tile is the floor tile in the shower. The lighter tile on the right is the shower tile and the larger darker tile on the left is the bathroom floor (this is the bathroom floor for the upstairs bath too). The downstairs bath is a grey tile that looks concrete. I like it the best but it was more expensive so we only did it in one bathroom. The wood is cabinet and granite is the counter top. Side Note: Not sure I am in love with the large tile options but they were the best options without an extra cost.
Our flooring options. Everything is hardwood except the bathrooms and bedrooms. We did upgrade to the extra padding for the carpet. Lillian took the courtesy of testing out the carpet for us as I took the picture.
The bronze fixture on the left will be lights in the three hall areas
The fan on top will be in all the bedrooms, the living room and the back patio.
This meeting wasn't as stressful as I thought it would be and we didn't spend too much extra on the upgrades. The main upgrades were the carpet padding and blinds; which aren't really an upgraded blind just the fact that they will buy and install them.
Designer Becky told us that they usually begin construction shortly after the meeting we had today. Once construction has started the house will be completed within 4-6 months. If the weather cooperates we could be homeowners (again) as early as July!